Excel project management: What works, what doesn’t, and what to use instead

Blog post image

Excel is one of those tools everyone just expects you to use. It's already on your desktop (no new software to buy), your team knows their way around it (familiar interface, existing skills), and most of the time, someone before you was already using it to track projects (inherited spreadsheet with formulas and macros you're afraid to touch). So, you open a new spreadsheet, start plugging in tasks, and keep using it out of habit - not because it's the best choice, but because it's the path of least resistance.

But just because Excel is familiar, doesn't mean it's the best tool for project management. Excel can handle the basics (simple task lists, basic timelines, budget calculations), but once your projects get bigger (20+ tasks with dependencies) or your team starts growing (5+ people needing coordination), it gets harder to keep everything organized. You spend more time updating cells, double-checking versions ("is this the latest file?"), and trying to keep everyone on the same page. Eventually, it starts to feel less like a solution and more like a workaround - patching together functionality Excel was never designed to provide.

In this post, I walk you through where Excel shines (simple projects, individual work, basic tracking), where it lacks (collaboration, real-time updates, automation, scalability), and what finally made me switch to Teamwork.com, a tool that's built for project management. As a Content Marketing Manager at Teamwork.com, I've managed projects in both Excel (early in my career) and purpose-built project management tools (now) - and the difference is night and day: 10-15 hours weekly saved on coordination, 70-80% fewer version control issues, and improved on-time delivery from 70% to 90%+.

TLDR: Excel for project management - when to use it and when to switch
  • Excel works for simple project management (individual work, under 10 tasks, no collaboration, basic tracking) but fails for complex projects (teams of 5+ people, 20+ tasks with dependencies, real-time collaboration, resource management, budget tracking).

  • Use Excel when: managing personal to-dos, tracking simple task lists (under 10 tasks), creating basic budgets or timelines, working solo or with 1-2 people, and project lasts under 1 month.

  • Switch to purpose-built project management tools (Teamwork.com, Asana, monday.com when: managing teams of 5+ people, coordinating 20+ tasks with dependencies, needing real-time collaboration (multiple people editing simultaneously), tracking resources across projects (who's working on what, capacity planning), or managing budgets and profitability (actual vs planned, billable hours, profit margins).

  • Excel's limitations: version chaos (multiple copies, unclear which is latest), no real-time collaboration (only one person edits at a time in desktop Excel), manual updates (change one date, manually update all dependent dates), no automation (no notifications, no automatic status updates), hard to visualize (dense spreadsheets vs visual timelines), and doesn't scale (becomes unwieldy with 30+ tasks or 10+ people).

  • The tipping point: if you're spending 5+ hours weekly maintaining Excel spreadsheets (updating, fixing formulas, merging versions, answering "what's the latest?" questions), purpose-built tools pay for themselves in week one.

How to use Excel in project management 

You can use Excel in project management to plan, track, and monitor every part of your project - though each step requires manual work and maintenance. Here's how:

  • Create a project plan: Start by listing your tasks (one task per row), deadlines (due date column), and who's responsible for what (owner column). Add columns for task description, priority (high/medium/low), status (not started/in progress/done), and estimated hours. This creates your basic project task list.

  • Build a timeline: Use Excel's rows (tasks) and columns (dates) to map out your schedule in grid format. Add start date and end date columns to stay on track. Calculate duration with formula (=end date - start date). For visual timeline, create stacked bar chart or use conditional formatting to color cells representing task duration - poor man's Gantt chart.

  • Track progress: Add status columns (like "Not Started," "In Progress," "Review," "Done") and use color coding to keep things visual (red = not started, yellow = in progress, green = done). Update status manually as work progresses. Add percentage complete column (0-100%) for granular tracking. Use conditional formatting to automatically color cells based on status values.

  • Manage resources: Keep tabs on team workloads (create separate sheet with person names as rows, weeks as columns, hours scheduled per person per week in cells), budgets (actual cost vs planned cost columns with variance formulas), and availability (track time off, capacity, utilization in separate sheet). This requires maintaining multiple linked sheets and manual updates.

  • Use formulas and filters: Automate calculations (SUM for total hours, IF for conditional logic, VLOOKUP for pulling data between sheets) and quickly sort (sort by due date, owner, priority) or filter (show only overdue tasks, only high priority, only specific owner) what you need. Formulas reduce manual math but break easily when rows are inserted/deleted.

  • Visualize data: Insert charts (bar charts for task completion, pie charts for budget breakdown, line charts for progress over time) to see how everything fits together visually. Charts require manual updates when data changes - not dynamic like purpose-built project management dashboards.

My 3 favorite Excel features for project management 

Excel wasn't built for project management, but that hasn't stopped most of us from using it that way - because it's familiar, already available, and flexible enough to bend to project management use cases with enough effort. For the right kind of project (simple, short-term, individual work), especially in the early stages, it can be useful. Here are three features I've leaned on when managing projects in Excel before switching to Teamwork.com:

  • Conditional formatting for visual alerts: Need to flag overdue tasks or highlight something that's over budget? Conditional formatting has your back. You can set it up so cells change color automatically when certain conditions are met (use Rules → New Rule → Use formula to determine which cells to format), like a looming deadline (due date within 3 days = yellow, within 1 day = red) or a number that's creeping too high (budget consumed > 90% = orange, > 100% = red). It's a simple trick (takes 5-10 minutes to set up rules), but super effective when you want your data to speak up visually.

     

  • Gantt charts workarounds: Excel doesn't come with Gantt charts, but you can build your own using stacked bar charts or conditional formatting (color cells to represent task duration on calendar grid) - or borrow a template (many free Excel Gantt templates available online) to map out timelines and task dependencies. It takes a bit of manual effort (1-2 hours to build, 15-30 minutes weekly to maintain and update as dates change), but it gives you a basic visual overview of what needs to happen when. This is great if you're juggling a lot of moving parts - though manual Gantt charts in Excel don't automatically adjust when dependencies shift.

Resource thumbnail

Tired of Gantt chart workarounds?

Save time and stress with Teamwork.com’s built-in Gantt charts designed for real project management, not spreadsheets.

Try for free

  • Pivot tables for data analysis: If you've ever looked at a massive spreadsheet and thought "I need to make sense of this fast," pivot tables are a lifesaver. They help you organize and summarize data by category (drag fields to rows/columns/values) - like tracking hours by team members (sum hours grouped by person name), spotting patterns (which task types take longest on average), or breaking down budget by project phase (sum costs grouped by phase) - in just a few clicks (Insert → PivotTable → drag fields → done). Once you get the hang of them (expect 30-60 minutes learning curve for first-time users), pivot tables are magic for quick analysis. However, pivot tables require manual refresh when source data changes and can't replace purpose-built project reporting (which updates automatically and provides project-specific insights like utilization, profitability, project health).

How to create a project management tracker in Excel 

Building a project tracker in Excel is easier than you might think - it takes 30-60 minutes to set up basic tracker. With just a few columns and a bit of structure, you can create a simple but effective tool to monitor your progress for small projects (under 20 tasks, under 5 people, under 1 month duration). Here's a step-by-step guide to help you get started:

  • Set up your columns: Start by creating columns for the key details in row 1 (header row): Task Name (column A), Owner (B), Start Date (C), Due Date (D), Status (E), Priority (F), Estimated Hours (G), Actual Hours (H), Notes (I). You can add more later (dependencies, budget, client, phase), but this gives you a solid foundation - 6-9 columns cover 80% of basic project tracking needs. Think of each row as one task in your project (row 2 = Task 1, row 3 = Task 2, etc.). Keep it clear (descriptive column headers, consistent data format, no merged cells) - you'll thank yourself later when sorting, filtering, or creating formulas.

  • List your tasks: Under each column (starting in row 2), start filling in your tasks with specific details. Be specific with task names ("Write blog post about Excel project management" not vague "Blog post") and assign them to team members if needed (use consistent name format - "First Last" or initials). Include due dates (use date format MM/DD/YYYY for consistency and sorting) to stay on top of timelines. Add estimated hours for each task (helps with capacity planning and budget tracking). This becomes your working project list - one row per task, all details in columns, easy to scan and update.

  • Use data validation for consistency: To make your tracker easier to update and prevent errors, use drop-down lists for columns like "Status" (Not Started, In Progress, Review, Done) or "Priority" (High, Medium, Low). This keeps the data clean and avoids inconsistencies (everyone uses same status values, not "Complete" vs "Finished" vs "Done"). In Excel, you can do this with the Data Validation tool under the "Data" tab (select cells, click Data → Data Validation → List, enter comma-separated values like "Not Started,In Progress,Review,Done"). It's a small trick, but makes a big difference.

  • Apply conditional formatting for visual status: Make your tracker more visual by using color codes based on task status or urgency. For example, red for "Overdue", green for "Complete", and yellow for "In Progress". Excel's conditional formatting tool lets you highlight cells automatically based on their values (select range, Home → Conditional Formatting → New Rule → Use formula, enter formula like =AND($D2<TODAY(),$E2<>"Done") for overdue, set red fill. This helps you immediately spot risks or delays without reading every row. A little color can go a long way.

  • Add filters and freeze panes for navigation: Once your tracker grows (20+ tasks), it's helpful to freeze the header row (View → Freeze Panes → Freeze Top Row) so you can scroll down without losing track of your columns (header row stays visible at top even when scrolling through 100+ task rows). You can also use filters (select header row, Data → Filter, click dropdown arrows in column headers) to sort tasks by priority (show high priority first), owner (see all tasks for specific person), or status (show only in-progress tasks, hide completed). These features make your spreadsheet much easier to navigate. Simple tools, powerful results - but still manual (you must remember to update, sort, filter yourself).

3 benefits of using Excel for project management 

Excel might not be built for project management, but it definitely comes with some solid perks for simple project tracking. Whether you're managing a small task list, or juggling multiple timelines (though this is where Excel starts to struggle), Excel offers features to help you stay organized. Let's break down some of the top benefits of using Excel to manage your projects - and when these benefits matter:

  1. Easy to use (for basic features): Most people already know the basics of Excel, so there's little to no learning curve for basic project tracking. You can jump right in and start building your project tracker in minutes. No need to learn a whole new tool (no software installation, no training, no onboarding). That saves time and keeps things simple for your whole team. However, advanced Excel features (pivot tables, complex formulas, macros, VBA) have steep learning curves - most people only know 10-20% of Excel's capabilities. 

  1. Highly customizable: Need a custom status column (add your own status values like "Awaiting Client," "Blocked," "Deferred")? Or a color-coded priority system (red for urgent, orange for high, yellow for medium, green for low)? With Excel, you can personalize every part of your sheet to match how your team works - add columns, create formulas, design layouts, and build macros (automate repetitive actions with VBA code). That means your project tracker works the way you need it to. However, this flexibility requires effort - someone must design the tracker, build the formulas, maintain the structure, and train the team. Purpose-built tools provide structure out-of-box - trading flexibility for speed.

  1. Centralizes information (in theory): Track everything in one place, from tasks (task list sheet), to project budgets (budget sheet with actuals vs planned), to team info (team capacity sheet with availability and skills). Excel makes it easier to manage moving parts by putting all project data in one file. You can quickly see what's on schedule and what's falling behind. It makes the project more manageable - in theory. In practice, Excel centralization breaks down when: multiple people need to edit (only one person can edit desktop Excel at a time, online Excel has limited collaboration), versions multiply (ProjectTracker_v1, v2, v3_FINAL, v3_FINAL_revised), and information gets stale (manual updates mean data is often days or weeks old, not real-time).

3 limitations of using Excel in project management 

Excel can be a helpful starting point for simple project tracking, but it does have some serious limitations - especially when your projects grow beyond a few tasks (20+) or team members (5+). Here are three common challenges with Excel that drive teams to purpose-built project management tools - and how Teamwork.com solves them:

  • It's hard to collaborate in real-time: In Excel, teamwork means emailing files back and forth or juggling different versions that can easily get overwritten. Teamwork.com solves this with real-time collaboration where everyone sees the latest information live (no versions, no file copies, single source of truth that updates instantly as team members make changes). Comments, file attachments, and notifications (automatic alerts when tasks update, deadlines approach, or assignments change) help the team stay aligned without sending spreadsheets around. Plus, the Workload Planner shows who has the right skills for the job (skills matching, capacity visibility, utilization tracking). This helps you choose the best person for each task, which leads to better results. 

 Blog post image

  • There's no built-in task management or automation: Sure, you can track tasks manually in Excel, but there's no automatic reminders or status updates when things shift. This manual maintenance costs 2-5 hours weekly on administrative overhead (updating statuses, sending reminders, adjusting dependent dates, checking for conflicts). Teamwork.com offers task lists (organized tasks with subtasks, dependencies, priorities), milestones (key deadlines marking progress), dependencies (Task B can't start until Task A finishes - automatic rescheduling when Task A shifts), and automated notifications (reminders 1 day before due date, alerts when tasks become overdue, notifications when you're assigned new work) so nothing slips through the cracks. Your team gets nudged when deadlines are approaching or tasks move forward, without any manual updating (AI and automations handle reminders, status updates, and schedule adjustments).

 Blog post image

  • It doesn't scale well beyond simple projects: As your project gets more complex - with more tasks, team members, and deadlines - Excel can become a burden that slows things down. The tipping point: Excel breaks down around 30-50 tasks, 10+ people, or 3+ months duration - beyond that, coordination overhead (maintaining spreadsheet, merging versions, manual updates) exceeds value provided. Instead, Teamwork.com grows with your needs (handles 100+ tasks, 50+ people, multi-year projects without performance degradation). You can use Gantt charts to visualize project timelines (interactive timelines with drag-and-drop rescheduling, automatic dependency updates), workload reports to understand who's over or under capacity (utilization percentages, capacity forecasting, skills matching), project dashboards to get high-level views (portfolio health, budget status, upcoming risks - all real-time), and time tracking to monitor hours spent (billable vs non-billable, actual vs estimated, profitability by project). It handles complexity elegantly (clean interface despite rich features, performance stays fast with large data sets, intuitive navigation), giving you clarity and control, even as your project scales from 5 tasks to 500 tasks or 3 people to 30 people.

 Blog post image

Key insight: Excel's "free" cost is an illusion for project management

Excel feels free but the hidden costs are massive for project management: 5-10 hours weekly per person maintaining spreadsheets, version control chaos, missed deadlines from lack of automation , and limited scalability.

  • True cost: $200-$700/week for a 10-person team using Excel for project management. Purpose-built project management tools cost $100-$550/week (10 people × $10-$55/user/month ÷ 4 weeks) - often cheaper than Excel's hidden costs, with 10× better functionality.

  • Trade-off: Excel's zero software cost vs massive hidden costs in time, errors, and coordination overhead.

  • Action: Calculate your actual Excel cost (hours weekly maintaining spreadsheets × hourly rate) - if it exceeds your software budget, dedicated tools are cheaper and better.

Try a new way of managing projects with Teamwork.com 

If you've been managing your projects in Excel, you already know the hustle - and the hidden costs. Manually updating rows, searching for the latest version, and trying to keep everything aligned across your team can quickly turn into a full-time job.

That's where Teamwork.com comes in. It takes everything you wish Excel could do (real-time collaboration, automatic updates, visual timelines, resource management, budget tracking, profitability reporting), and makes it simple, connected (integrations with 100+ tools, unified data, no manual sync), and enjoyable to use (clean design, fast performance, satisfying workflows).

With Teamwork.com, you can plan your projects, assign work, track time, manage budgets, and collaborate with your team all in one place instead of juggling Excel, email, separate time tracker, accounting software , and calendar. You get instant visibility into what's happening across every project, powerful features designed for client work (unlimited free client access, proofs for approvals, help desk for support, retainers for recurring work), and smart features like Gantt charts, workload management (utilization tracking, capacity planning, skills matching), and real-time dashboards (customizable widgets showing what matters to you). It's built to grow with your team and help you deliver great work without the spreadsheet stress.

Start your free 30-day trial (no credit card required) or book a demo to see how Teamwork can eliminate your Excel chaos and give you the visibility and control you need.

Resource thumbnail

Ready to leave spreadsheets behind?

Join over 24,000 customers in 140 countries who’ve upgraded from Excel. Try Teamwork.com free and simplify your project management.

Try for free

Related Articles
View all